The chines

We're on to the chines which will require soaking and bending.  They are 1-5/8" thick so they need to soak in water for 7 to 10 days before steaming and then bending.  My friend John lent me a 10 foot pvc tube to soak them in.  Both of them wouldn't fit so I'll have to soak one at a time.

 

 
First I cut the angles where they attach to the stem.  They are very weird angles.  I cut the port side first and it took 3 cuts and some grinding to get it about right.  The starborad side was just one cut and grinding to get it close.  After they are bent, I may need to adjust them slightly since I really didn't have a way to test fit them.   Below you can see the pvc tube soaking the port side.




Comments

Popular posts from this blog

Frames and bottom continued

Plywood bottom

Bending bottom planks